- ACCIONA
- Projects
- Water
- Drinking Water Treatment Plants
- Martos DWTP
With a treatment capacity of 270 litres per second, the DWTP is equipped with brackish water treatment technology in order to deal with the salinity of the Víboras reservoir.
Design and construction of the Martos DWTP. The plant has 2 water trains that include coagulation-flocculation, lamella settling with sludge recirculation, sand filtration and disinfection.
The second train differs from the first in that it includes a water salinity reduction step that uses reverse osmosis, upstream of the disinfection phase. The stages of the reverse osmosis process are: chemical conditioning, cartridge filtration and reverse osmosis (osmosis line: 15,552 m3/day). The plant also has a sludge train that includes a buffer tank, mechanical dewatering using centrifuges, and a dewatered sludge storage silo.
A Joint Venture formed by ACCIONA Agua and the local companies Jardine Electric Control Philippines (JECP) and Frey Fil are responsible for the design, construction, operation and maintenance of the Putatan Water Treatment Plant 2.
The Mundaring Water Treatment Plant is the major source of water for over 100,000 consumers connected via rural and town services that comprise the Goldfields and Agricultural Water Supply Scheme. The potable water network spans from Mundaring Weir in the Perth Hills to Kalgoorlie and considered to be the longest fresh water supply scheme in the world.
View ACCIONA Social Networks