The new plant is situated in Muntinlupa, in the south of the metropolitan area of Manila, next to an existing Water Treatment Plant (Putatan 1). The new plant will provide drinking water to almost 6 million people. The Plant will have a capacity of 100,000 m3 per day, extendable to 150,000 m3 per day.
Maynilad Water Services Inc. (MWSI), a provider of water and wastewater services for the 17 cities and municipalities that make up the western part of Greater Manila, awarded the contract to a joint venture consisting of ACCIONA Agua and the local companies Jardine Electric Control Philippines (JECP) and Frey Fil.
One of the main characteristics of the new plant is the advanced treatment of raw water from Laguna de Bay, the biggest lake in the Philippines and the second-biggest inland freshwater lake in South-East Asia, to deliver clean drinking water with a very low carbon footprint. Construction is expected to last 18 months.
The treatment plan for the new plant includes a number of advanced technical processes to ensure clean potable water. These techniques include Dissolved Air Flotation (DAF), Biological Aerated Filter (BAF), Ultrafiltration (UF), Reverse Osmosis (RO) and disinfection in different stages through the oxidation of particular compounds.
Commissioning
Operations and maintenance for 1 year
One of the main characteristics of the new plant is the advanced treatment of raw water from Laguna de Bay, the biggest lake in the Philippines and the second-biggest inland freshwater lake in South-East Asia, to deliver clean drinking water with a very low carbon footprint.
ACCIONA, as part of a consortium, was awarded the contract for Design and Construction brackish water desalination plant that has an extendable capacity of up to 150.000 m3/d (150 MLD)
The Putatan WTP 2 will provide additional clean drinking water to almost 6 million people in the metropolitan area of Manila
The Plant will have a capacity of 100,000 m3 per day, extendable to 150,000 m3 per day
The project is confirmed and construction underway which will be completed in mid-2018.
Tour the project site via 360 degree aerial imagery here
The Mundaring Water Treatment Plant is the major source of water for over 100,000 consumers connected via rural and town services that comprise the Goldfields and Agricultural Water Supply Scheme. The potable water network spans from Mundaring Weir in the Perth Hills to Kalgoorlie and considered to be the longest fresh water supply scheme in the world.
The plant provides water to the towns of Fajardo, Ceiba and Luquillo, from a reservoir fed by the River Fajardo.
View ACCIONA Social Networks