This project consisted of the construction of a mooring line approximately 320 m long, with a 16-m draft depth, running from the current ramp of the Bufadero Container Base, following an approximately parallel alignment with the current wharf of the eastern container terminal.
The City of Toronto Deep Lake Water Cooling (DLWC) system is the world’s largest cooling solution of its kind. The system was built by ACCIONA Infrastructures to offer a sustainable, alternative source of air conditioning by using cold water from the depths of Lake Ontario to cool downtown Toronto office buildings.
Expansion of the navigation channel from a bottom depth of 80 m to 120 m, allowing access to larger vessels and the possibility of incorporating new commercial routes.