    New Container Base at the East Dock

    This project consisted of the construction of a mooring line approximately 320 m long, with a 16-m draft depth, running from the current ramp of the Bufadero Container Base, following an approximately parallel alignment with the current wharf of the eastern container terminal.

    General Information

    Location
    Canary Islands, Spain
    Contract type
    Construction
    Infrastructure
    Mooring line approximately 320 m long, with a 16-m draft depth
    Year of project completion
    2008

    Image Gallery

    discover other flagship projects

    Deep Lake Water Cooling System

    Ontario (Canada)

    The City of Toronto Deep Lake Water Cooling (DLWC) system is the world’s largest cooling solution of its kind. The system was built by ACCIONA Infrastructures to offer a sustainable, alternative source of air conditioning by using cold water from the depths of Lake Ontario to cool downtown Toronto office buildings. 

    Port of Salina Cruz

    Salina Cruz, Oaxaca (Mexico)

    Expansion of the navigation channel from a bottom depth of 80 m to 120 m, allowing access to larger vessels and the possibility of incorporating new commercial routes.

    Move up