- ACCIONA
- Projects
- Water
- Desalination plants
- Fouka Desalination Plant
The raw water enters an open intake system located about 1,800 m offshore.
The intake system is connected to the plant via a 1,600-mm diameter pipeline. The length of the brine outfall is 380 m, and its diameter is 1,200 mm.
Design, Build and 7-year Operation & Maintenance (DBOM) Contract for a 137,000 m3/day seawater desalination plant at this Emirate for the enlargement of the IWPP Fujairah-1 desalination plant.
The contract includes Design, Build and Commissioning of the Al Jubail RO4 100,000 m3/day seawater desalination plant.
View ACCIONA Social Networks