- ACCIONA
- Projects
- Construction
- Port and Hydraulic Works
- Roda de Barà Marina
The new harbour, with an approximate area of 191,000 m2, optimizes the activities directly related to the port, and is designed to accommodate 725 boats, mainly of medium size (8 m to 20 m in length), 10 of which may exceed 20 m, and 78 of under 8 m to be moored in the dry dock.
Roda de Barà Port offers 643 moorings for boats with a length of between 8 m and 25 m, and 132 warehouses with sizes between 7 m and 9.5 m. The concessionaire also operates a parking area with 511 spaces. The port also includes 7,000 m2 of commercial area and 5,000 m2 of green space.
The City of Toronto Deep Lake Water Cooling (DLWC) system is the world’s largest cooling solution of its kind. The system was built by ACCIONA Infrastructures to offer a sustainable, alternative source of air conditioning by using cold water from the depths of Lake Ontario to cool downtown Toronto office buildings.
Expansion of the navigation channel from a bottom depth of 80 m to 120 m, allowing access to larger vessels and the possibility of incorporating new commercial routes.
View ACCIONA Social Networks