- ACCIONA
- Projects
- Construction
- Port and Hydraulic Works
- Raíces Wharf Extension, Port of Avilés
This project involved the construction of a wharf 130 m long and with a 12 m draft depth for mooring vessels of up to 35,000 kg dead weight.
The wharf is 25.12 m in length and the quay has a length of 22.08 m.
The City of Toronto Deep Lake Water Cooling (DLWC) system is the world’s largest cooling solution of its kind. The system was built by ACCIONA Infrastructures to offer a sustainable, alternative source of air conditioning by using cold water from the depths of Lake Ontario to cool downtown Toronto office buildings.
Expansion of the navigation channel from a bottom depth of 80 m to 120 m, allowing access to larger vessels and the possibility of incorporating new commercial routes.
View ACCIONA Social Networks