- ACCIONA
- Projects
- Construction
- Port and Hydraulic Works
- New Oza Dock
This project consisted of the construction of a fishing dock formed by a 1,064 m long breakwater, in three alignments. The inside breakwater, which contains a 6 m deep and 1,083 m long caisson quay; a 167 m long external dike; 200 m of artificial beach between the outer sea wall and the "Talleres Valiña Lavandeira" franchise, with a 20 m minimum width of dry beach; and the foundations (dredging and pavement) for the future Altura and Bajura jetties, both 6 m deep and 200 m and 150 m long respectively.
The City of Toronto Deep Lake Water Cooling (DLWC) system is the world’s largest cooling solution of its kind. The system was built by ACCIONA Infrastructures to offer a sustainable, alternative source of air conditioning by using cold water from the depths of Lake Ontario to cool downtown Toronto office buildings.
Expansion of the navigation channel from a bottom depth of 80 m to 120 m, allowing access to larger vessels and the possibility of incorporating new commercial routes.
View ACCIONA Social Networks