- ACCIONA
- Projects
- Construction
- Port and Hydraulic Works
- Ferrol Outer Harbour
The sea wall is on a slope, and has a natural foundation. The external protective layer consists of two layers of 90-ton concrete blocks, with a total thickness of 6.8 m. The wharf also serves as an enclosure, and is made up of 30 reinforced concrete caissons, with a depth of 20 m.
The work included the second phase of the extension includes the 656 m extension using caissons from the existing riverside wharf alignment to integrate 1,515 m of wharf with a draft depth of 20 m, defined in the El Ferrol Harbour Extension Project.
The City of Toronto Deep Lake Water Cooling (DLWC) system is the world’s largest cooling solution of its kind. The system was built by ACCIONA Infrastructures to offer a sustainable, alternative source of air conditioning by using cold water from the depths of Lake Ontario to cool downtown Toronto office buildings.
Expansion of the navigation channel from a bottom depth of 80 m to 120 m, allowing access to larger vessels and the possibility of incorporating new commercial routes.
View ACCIONA Social Networks