    Açu Port

    Engineering, design and construction of the breakwaters for a shipyard

    Home-grown technology for building the breakwaters using the caisson construction method, a pioneering initiative in Latin America.

    More than 3.8 kilometres of breakwater, 2.8 km of which will be made artificially using concrete blocks.

    General Information

    Location
    Açu, Brazil
    Contract type
    Design and construction
    Infrastructure
    More than 3.8 km of breakwater, 2.8 km of which was made artificially using concrete block
    Year of project completion
    2015

    Image Gallery

    discover other flagship projects

    Deep Lake Water Cooling System

    Ontario (Canada)

    The City of Toronto Deep Lake Water Cooling (DLWC) system is the world’s largest cooling solution of its kind. The system was built by ACCIONA Infrastructures to offer a sustainable, alternative source of air conditioning by using cold water from the depths of Lake Ontario to cool downtown Toronto office buildings. 

    Port of Salina Cruz

    Salina Cruz, Oaxaca (Mexico)

    Expansion of the navigation channel from a bottom depth of 80 m to 120 m, allowing access to larger vessels and the possibility of incorporating new commercial routes.

    Move up